Home/Trades/Structural works
Trade · 01 · Structure

Structural works.

Foundations, frame and masonry: the base of everything AHMA builds, from earthworks to superstructure.

« Building today, passing on tomorrow's craft » Ait Haj My Abdelghni, Chairman and Chief Executive Officer
Field of operationsStructure
ExecutionAHMA teams & equipment
The trade

The structure, built in-house.

Structural works are the base of everything AHMA builds: they give a building its form, its strength and its permanence. From foundations to superstructure, the company builds the entire load-bearing structure with its own teams and its own equipment: tower cranes, batching plants, formwork and earthmoving machinery. Nothing that touches the core of the building is subcontracted. Every footing, every column and every slab is poured, inspected and delivered in-house, to seismic design standards and to the most demanding public specifications.

This complete command of the structure, site after site, is what allows AHMA to meet both its deadlines and its quality standards on major works: hospitals, courthouses, barracks, sports and cultural facilities. By keeping structural works in-house, the company retains control of what matters most, the safety and durability of the finished work, and lays the foundations, literally and figuratively, for a building meant to stand for decades. That standard, set at the outset, is what makes the difference across every trade that follows.

Guides

Further reading.

AHMA structural works site: reinforced concrete frame going up
Building techniques

Structural works: definition, stages and how they differ from fit-out and finishes

Structural works, gros œuvre in French, are the works that hold a building up: earthworks, foundations, the reinforced concrete structure, masonry, the roof structure and basic waterproofing. They come before fit-out and finishes (second œuvre), which make the building usable. In Morocco, their design and execution follow the seismic design code RPS 2000, version 2011.

Charifa regional hospital in Marrakech
Building techniques

RPS 2011: the seismic building code in Morocco

RPS 2011 is Morocco's seismic building code, "RPS 2000, version 2011", approved by Decree n° 2-12-682 of 28 May 2013, which amends Decree n° 2-02-177 of 22 February 2002. It applies to buildings throughout the country, places every municipality in a velocity zone and an acceleration zone, and divides buildings into three classes according to their use. Since the Al Haouz earthquake, a single change has been published: the zoning of 80 municipalities, revised by a decree of 22 October 2024.

AHMA concreting plant
Building techniques

Construction glossary in French, Arabic and English: 74 site terms

Structural works are gros œuvre in French and الأشغال الكبرى in Arabic, earthworks are terrassement and أعمال الحفر, the client is the maître d'ouvrage and صاحب المشروع. This construction glossary brings together 74 terms from building and public works in Morocco, grouped by family, with the French, the Arabic of the official texts, British English and a one-sentence definition.

All news
Let’s get to work

A project to build? Let’s talk.

« Building today, passing on tomorrow's craft »